Routing cards and work centers

A routing card sets the sequence of operations at work centers. Cycle time, capacity load and the labor part of cost are calculated from it.

What is included?

  • Operations at work centers and groups of interchangeable centers
  • Setup time, time per unit and overlap percentage
  • Piece rate and required qualification
  • A quality checkpoint on an operation
  • Work centers: machine, area, team, line, each with its own calendar
  • Production cycle calculation

Part of Mode 2 of the “Production” module.Pricing

Frequently asked questions

Where does the machine hour cost come from?

From the work center card. It goes into full cost together with labor and overheads.

Are work centers linked to equipment?

Yes. Equipment from maintenance is linked to a work center, and downtime for repairs reduces its available time.