Routing cards and work centers
A routing card sets the sequence of operations at work centers. Cycle time, capacity load and the labor part of cost are calculated from it.

What is included?
- Operations at work centers and groups of interchangeable centers
- Setup time, time per unit and overlap percentage
- Piece rate and required qualification
- A quality checkpoint on an operation
- Work centers: machine, area, team, line, each with its own calendar
- Production cycle calculation
Part of Mode 2 of the “Production” module.Pricing
Frequently asked questions
Where does the machine hour cost come from?
From the work center card. It goes into full cost together with labor and overheads.
Are work centers linked to equipment?
Yes. Equipment from maintenance is linked to a work center, and downtime for repairs reduces its available time.
Also in this module
Bills of materials
A product structure with versions: an approved one is not edited, an edit creates a new one.
Learn moreProduction orders
Shortages are visible before start, and a material is substituted right in the production order.
Learn moreOutput and defects
How much is good, how much is defective, who is at fault and what to do with it.
Learn more
Build your own setup
The warehouse works on its own, the rest connects as you grow. We will show on your data which modules cover the task.