PlanningMode 2

MRP requirements planning

The run collects demand from the plan and customer orders, explodes bills of materials down to raw materials, subtracts balances and expected receipts, and shifts dates by purchase and production lead times. The result is recommendations, not a spreadsheet for manual processing.

What is included?

  • Planning horizon and interval
  • BOM explosion and net requirements
  • Rounding to the minimum lot and lot multiple
  • Recommendations: production order or purchase order, one at a time or in a batch
  • Comparison with the previous run
  • Main plan and scenarios, cycle detection in bills of materials

Part of Mode 2 of the “Planning” module.Pricing

Frequently asked questions

How long does a run take?

The run works in the background with real-time progress and can be cancelled. Work in the system does not stop in the meantime.

What if a document already exists for a recommendation?

The recommendation can be closed with the existing document so that it does not create a duplicate.

Also in this module

All about the module: Planning

Build your own setup

The warehouse works on its own, the rest connects as you grow. We will show on your data which modules cover the task.