MRP requirements planning
The run collects demand from the plan and customer orders, explodes bills of materials down to raw materials, subtracts balances and expected receipts, and shifts dates by purchase and production lead times. The result is recommendations, not a spreadsheet for manual processing.

What is included?
- Planning horizon and interval
- BOM explosion and net requirements
- Rounding to the minimum lot and lot multiple
- Recommendations: production order or purchase order, one at a time or in a batch
- Comparison with the previous run
- Main plan and scenarios, cycle detection in bills of materials
Part of Mode 2 of the “Planning” module.Pricing
Frequently asked questions
How long does a run take?
The run works in the background with real-time progress and can be cancelled. Work in the system does not stop in the meantime.
What if a document already exists for a recommendation?
The recommendation can be closed with the existing document so that it does not create a duplicate.
Also in this module
Reorder point
Simple planning: the balance falls below the point, and the system suggests an order.
Learn more- Mode 2
CRP capacity load
Where the bottleneck is and where to move work before a deadline is missed.
Learn more